Reporting period 10/01/2017 to 09/01/2022

 

Hours of use

D2: 2258

D8: 675

 

Newest User

Bankole O., D8 

Cameron L., D2 

 

Classes that have used the Instruments

04/25-04/26/2018 Chem 330 Analytical Chemistry, 4 demo labs on D8, 44 students

10/31-11/15/2018 Chem 423 Physical Chemistry, 3 T-Stage labs on D8, 7 students

03/27-04/25/2019 Chem 423 Physical Chemistry, 5 T-Stage labs on D8, 12 students

04/12/2019 Chem 330 Analytical Chemistry, 2 demo labs on D8, 20 students

11/06-11/21/2019 Chem 423 Physical Chemistry, 5 T-stage labs on D8, 12 students

 

Training sessions

11/02/2017 Salvador P., D2 hardware setup

11/16/2017 Manuel A. G., D8 general

12/06/2017 Manuel A. G., D8 hardware setup

03/22/2018 Molla Shakirul I., D2 general and hardware setup

05/03/2018 Lisa S., D2 general and hardware setup

04/30/2018 Manuel A. G., D8 Lowtemp stage setup

07/19/2018 Mohammad S., D2 general and hardware setup

07/26/2018 Ayako K., Dustin P. (NexTech Batteries), D2 general and hardware setup

09/06/2018 Kurt K., D8 general and hardware setup

02/19/2019 Xing Z., D8 general and hardware setup

02/25/2019 Nikhil D., D8 general and hardware setup

03/27/2019 Ilya D., D8 Lowtemp stage operation

05/23/2019 Sara S., D2 general and hardware setup

07/09/2019 Nikhil D., D2 general and hardware setup

07/11/2019 James I., D2 general and hardware setup

08/05/2019 John M., D2 general and hardware setup

Dominion F., D2 general and hardware setup

Katherine J., D2 general and hardware setup

Dalton K., D2 general and hardware setup

Hanging P., D2 general and hardware setup

Connor F., D2 general and hardware setup

Nicholas P., D2 general and hardware setup

Sara H., D2 general and hardware setup

Alessandro R., D2 general and hardware setup

Salvador P., D8

Pradeep S., D8

 

Visitations

10/13/2017  4 Nevada Bound prospective students

11/03/2017  2 Nevada Bound prospective students

11/17/2017  4 Nevada Bound prospective students

12/01/2017  4 Nevada Bound prospective students

02/16/2018  5 Nevada Bound prospective students

03/09/2018  1 Nevada Bound prospective student

03/30/2018  5 Nevada Bound prospective students

04/13/2018  1 Nevada Bound prospective student

04/20/2018  1 Nevada Bound prospective student

05/04/2018  1 Nevada Bound prospective student

10/05/2018  1 Nevada Bound prospective student

10/12/2018  1 Nevada Bound prospective student

10/19/2018  5 Nevada Bound prospective students

11/02/2018  2 Nevada Bound prospective student

11/30/2018  2 Nevada Bound prospective students

02/22/2019 2 Nevada Bound prospective students

03/08/2019 2 Nevada Bound prospective students

03/29/2019 2 Nevada Bound prospective students

04/05/2019 2 Nevada Bound prospective students

 

Industrial users

NexTech Batteries, 32.25h

 

Publications

YT Lee, RP Gautam, SM Islam, CJ Barile: J. Phys. Chem. C 2019, 123, 1287-1292

MS Islam, CJ Barile: ACS Appl. Mater. Interfaces 2019, 11, 43, 40043-40049